We need to have a panel of base board repaired before we do some concreting. The panel is approximately 2500 long by 600 high and has a vent in it. Part of it is behind some pre-existing concrete. Please see attached photos for board material.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great communication, job done to a great standard
Work carried out by the owner/operator
Reviewed on 19-01-2016
Partner with Builderscrack
Get work