We are a charitable trust upgrading facilities on a category one heritage building. We have a medium sized steel framed building that needs to have extra interior framing put up, then lined with approx 12mm plywood, with some windows framed as well. We have a second building that needs two secure exterior doors with possible new frames, and one new internal door for toilet area. We will need in the future other doors and some general building work undertaken as funds and design work is completed. This is not urgent work but does need to be completed in next 6 - 12 months.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
4.0
|
Work carried out by the owner/operator
Reviewed on 10-04-2022
Partner with Builderscrack
Get work