We are installing a new kitchen, and removing our existing kitchen to make room. In order to cater for the new design we need to build 2 small extensions to existing walls. Will require timber framing, plaster board and stopping. Timeframe: flexible over the next month, required completion by first week of November
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Jesse was great to deal with and the job was finished to a high standard. Will be getting him around for more work in the future
Work carried out by the owner/operator
Reviewed on 15-11-2021
Partner with Builderscrack
Get work