Our shower has been leaking into the floor underneath, which has started to bow. The shower door and base are still good, but the linings on the walls need to be replaced, as well as the floor boards underneath. The shower base and door need to be removed to fix the floor underneath, but we would like to reuse them if possible. The shower measures 700mm wide x 700mm deep.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very quick to respond and answer queries, very professional. Was very impressed with job done as well. Would definitely use again for future jobs. Shower looks great, thanks Scott
Work carried out by the owner/operator
Reviewed on 25-09-2010
Tradesperson reply
"Nice people to work for and thanks for the 5 out of 5 rating in all areas.. The job price did go up as we replaced the whole bathroom floor with H3.2 Ply, as discussed and agreed with Andrew the owner for future protection. We also accepted split payments to make things easier for them. Glad they are happy which is always our aim.Thanks for this small project, we hope you enjoy it for many years. We would be happy to work for Andrew or his friends and family again. Cheers Scott"
#1 | Tradie 1 | No recent reviews | 2 jobs | Secured job |
#2 | Tradie 2 | No recent reviews | 5 jobs | No longer in contact |
#3 | Tradie 3 |
|
15 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 49 jobs | No longer in contact |
#5 | Tradie 5 | Not reviewed | 0 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 11 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 24 jobs | No longer in contact |
#8 | Tradie 8 | No recent reviews | 9 jobs | No longer in contact |
Partner with Builderscrack
Get work