Current layout is bedroom, bathroom and wash house joined by a small hallway. The idea is to combine bathroom and wash house so current hall way can become cupboards. Relocate bedroom door to a different wall. See basic diagrams attached. I can do finishing gib and painting work, but need someone to do the more major construction and electrical work. Basic requirements are: 1. Remove hall way wall 2. Remove bathroom/ wash house wall 3. Fill in current bedroom door as a wall. 4. Create new bedroom door on lounge wall 5. Replace current sliding door with swinging door 6. Build cupboards frame There is electrical and plumbing on one of the walls that will need to be shifted and we can discuss this at the initial inspection.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Really good guy to deal with. Listen to my continued changes and really understood what I was trying to achieve at both the design and cost saving level.
Work carried out by the owner/operator
Reviewed on 19-06-2020
#1 | Tradie 1 |
|
39 jobs | Secured job |
#2 | Tradie 2 |
|
30 jobs | No longer in contact |
#3 | Tradie 3 |
|
154 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 9 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 7 jobs | No longer in contact |
#6 | Tradie 6 |
|
37 jobs | No longer in contact |
#7 | Tradie 7 |
|
30 jobs | No longer in contact |
#8 | Tradie 8 | No recent reviews | 1 job | No longer in contact |
Partner with Builderscrack
Get work