1. Close in existing carport - Timber framing with internal and external weatherboards - approx 2m - Install existing aluminium sliding door - Install PFC portal frame over garage door - Install new garage door 2. Close in existing deck - approx 9m2 - Remove existing timber framed wall 900mm high - approx 9m - Remove existing waterproofing membrane - Raise existing deck to internal floor level and new part brd floor - Remove existing aluminium sliding door - Remove existing cedar weatherboards - External timber framed walls with cedar weatherboards and plasterboard linings - Raking ceiling to match existing - New aluminium windows - New internal door - New roof structure - Exclude roof covering and spouting - Electrical, data and TV 3 Fitout existing upstairs loft - New main bedroom with WIR and En-siute - 24m2 - New Floorboards over existing timber floor - Remove existing plasterboard linings - New timber framed walls, plasterboard and paint, tiled en-suite - New floor boards and carpet - New ceiling - New balustrade to stairs - Electrical, data and TV - Plumbing and gas fitting, gas water heater Notes Roof covering - replaced by others
#1 | Tradie 1 |
|
36 jobs | No longer in contact |
#2 | Tradie 2 |
|
344 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 7 jobs | No longer in contact |
#4 | Tradie 4 |
|
37 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 0 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 0 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 9 jobs | No longer in contact |
#8 | Tradie 8 | No recent reviews | 1 job | No longer in contact |
Partner with Builderscrack
Get work