Our ensuite shower has been leaking requiring us to redo the ensuite. We need to replace the flooring from chip board to meet current building standards and replacing jib board on the walls. Floor is 3.4x3.6m. with 2.4m stud. Also need a non load bearing wall in the walk in robe to be removed. It's 300mm long and 2m high. Note it doesn't go to the Cieling. Have a tiler booked for mid June.
#1 | Tradie 1 |
|
19 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 5 jobs | No longer in contact |
#3 | Tradie 3 |
|
59 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 1 job | No longer in contact |
#5 | Tradie 5 | No recent reviews | 5 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 2 jobs | No longer in contact |
Partner with Builderscrack
Get work