Review

Adding an internal beam

Job image
Job image

Job description

General Building
Manukau

Hi there, we are in need of removing a half wall in between our lounge and kitchen area to make it an open plan area, then an approximately 6m FB30M beam added in. We already have got the plans drawn and submitted for building consent and will require the job started in about 4-6 weeks time. Quality of the job is very important to us but at this stage, our timeframe may prioritise over it as we want the new kitchen (kitchen plans are completed) completed by Christmas. Thankyou very much in advance! Kind regards Tony


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Tui & CK was very impressive in every aspect of our project!We needed a structural wall removed with little roof space so was advised by the architect it will be an exposed beam.He provided a very detailed quote & was the only tradie who also looked into how & equipment required to get the beam up as we require neighbors consent.He turned up on time & surprised us by making the beam internal even though it required them more work!Our lounge wouldn't have been the same otherwise!THANKYOU GUYS!=D

Work carried out by the owner/operator
Reviewed on 07-12-2018

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo