Review

Woodburner removal

Job image

Job description

General Building
Kapiti Coast

An existing woodburner complete with chimney requires removal. This will involve roof repairs, ceiling repairs and removal of brickwork behind the heater. The heater stands on a small plinth. This will need to be taken back to floor level. Once the removal work is done, the walls will need regibbing and plastering. No painting is required. The ceiling has rectangular tiles and a good match would be desirable. Tiles are 598mm x 400mm. Two additional power points are needed in the new gib.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

THe job was completed exactly as promised. Excellent all round from first contact to the final clean up. I would recommend Harley to anyone.

Work carried out by the owner/operator
Reviewed on 03-10-2021

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo