Remove wall between bathroom and toilet, relocate existing bath plumb in new shower and vanity.Remove existing wall boards and replace with plaster boards and finish off.Remove tiles in bathroom and toilet.Block off one of the doorways.
#1 | Tradie 1 |
|
19 jobs | No longer in contact |
#2 | Tradie 2 |
|
3 jobs | No longer in contact |
#3 | Tradie 3 |
|
12 jobs | No longer in contact |
#4 | Tradie 4 |
|
27 jobs | No longer in contact |
#5 | Tradie 5 |
|
36 jobs | No longer in contact |
Partner with Builderscrack
Get work