Published: 30 March 2020
There is a leak from the recent storm; with prime suspected cause being the missing scribers between weatherboard/facing board. This job is to: - Fill in 15 gaps as shown in photo between weatherboard and the facing board using Sikaflex MS Black o The 15 gaps starts from the top on the right hand side o Sikaflex MS Black can be provided by me, if you wish - The height of the top gap (near apex of the roof) is approximately 4m off the ground You would be expected to: - Bring your own equipment, including ladder o But Sikaflex MS Black can be provided by me if necessary - Mask off each gap with masking tape prior to applying silicone, as shown in photo - Trowel off silicone properly to completely fill gap, as shown in photo - Take a photo for each completed silicone plug (and send by sms/whatsapp/email whichever is easier), as inspection evidence. - Keep social distancing, which should be easy as this is an outside job. Thank you.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Quick and easy.
Work carried out by the owner/operator
Reviewed on 05-05-2020
Partner with Builderscrack
Get work