Published on 10th September 2025
Looking to get this job done in Nov/Dec
Photos to follow.
Remove existing plasterboards - mixture of old fibre board and gib
Remove Ceiling Gib - currently coated in popcorn textured coating - not asbestos (have tested previously)
Remove existing skirting boards and architraves
Remove built in wardrobe
Dispose of all the above.
Re line room
Add insulation
New Gib, Plaster, skirting, etc and paint finish the bedroom.
Add 1 PowerPoint - Reposition existing.
Room Approx. 4x 3.5m to confirm
Ceiling 2.7m High
Looking for a price at this stage - could look at additional work
Another room - same treatment.
| Quality of work | — | The quality of workmanship provided |
| Cost | — | How well they kept to the quoted cost |
| Schedule | — | How well they kept to schedule |
| Communications |
5.0
|
Their professionalism and responsiveness |
""
Review posted by Craig on 29th December 2025
Verified communication review
Partner with Builderscrack
Get work