Active job

Bathroom re-flooring

Job image

Job description

General Building
Grey

We have an older bathroom which needs the existing T&G floor removed, a new particle board floor installed after levelling of the joists. Then re-install the bath, line two walls with waterproof wallboard, install a replacement bathroom cabinet as well as replacing a bi-fold door into the room with a single standard door. There is also some small areas of Gib repair and plastering.


Trade professionals

Finding available tradies …

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo