The piles are sinking in places - posts need to be lifted a bit and supported again. Small 3 bedroom. Then an extension of bedroom/bath/toilet attached to the rear to be added.
#1 | Tradie 1 |
|
109 jobs | No longer in contact |
#2 | Tradie 2 |
|
42 jobs | No longer in contact |
#3 | Tradie 3 |
|
6 jobs | No longer in contact |
#4 | Tradie 4 |
|
2 jobs | No longer in contact |
Partner with Builderscrack
Get work