Require placement of two barge boards located in the pictures below as they have become rotten. There may be more work required beneath depending on the spread of the rot. The one on the left could be accessed with a long ladder. The one on the right is above a set of stairs and so would be best to be accessed from the roof (the roof is low pitched).
#1 | Tradie 1 |
|
180 jobs | No longer in contact |
Partner with Builderscrack
Get work