Removal of:
 - Remaining coving - Bathroom sink vanity
 - Existing shower - shower liner from the wall, shower cubicle and base.
 - Remove tiles from the wall above the sink vanity unit.

 Shower cubby prep:
 - Add framing to create an in-shower shelf/cubby

 Jib:
 - Replace jib behind shower etc -(aqua jib) - ready for waterproofing Install: New vanity


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Jason did an awesome job! He prepped our bathroom, removed the tiles, vanity, shower unit, and liner, put in a new aqua job, made new cubbies for the shower and above the bath, and removed the old coving. He worked nonstop the entire time he was here and cleaned up superbly after he was finished. I highly recommend him for your next project!

Work carried out by the owner/operator
Reviewed on 04-09-2024

Tradesperson reply
"thanks for the review i appreciate it and I enjoyed getting to know you guys"

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo