we require a builder with an assistant for the construction of a tanalised timber bridge kitset. This is an 8 metre bridge across a dry irrigation channel and comes with side rails and all the fixings. Foundations will already be in place and the supplier estimates 2 - 3 days maximum time for assembly. Would suit a trades person wanting a small fill-in job. A tractor with font end loader or small digger will be required to lift in the main poles. Work has to be completed before the 3rd week in August 2018. There is no electricity at the site, so cordless drills and saws etc. would be required. A health and safety discussion / plan would be required. To look at the bridge design go to ---