New Zealand is at Alert Level 4. Please be aware only emergency works can be carried out on residential and commercial property during this time. Tradies and Homeowners can still communicate to discuss quotes and information for future jobs, as long as this is in-line with the current Alert Level 4 restrictions. More information available here.

Post job.
Choose tradie.
Easy.

With thousands of tradies across NZ, Builderscrack has your job covered

Media Room upgrade

Job description

closed
Posted 5 months ago

This is what I require:

Lobby/Library Entrance:
Install a ceiling support for pivot door;
Erect wall framing 2600 x 2450 against concrete block to attach Veneer Wall Panel (includes exit door);
Finish ceiling to allow an 4000 x 20 LED aluminum extrusion with perfect edge on gib;
Install new ceiling 2500 x 4500;
Install 8600 x 2790 veneer panel board with black negative detail, combination pin + glue.

Media Room:
Erect L-Shaped wall ... x 2450;
Finish wall/ceiling/floor for aluminum framed doors 3600 x 2310, transom set against ceiling;
Frame wall for a perfect edge on jib for flush TV 1730 x 1000;
Install TV wall bracket.

Toilet:
Frame wall 550 x 1200 for a recessed handbasin finished in stone;
Install one 1240 x 2450 veneer panel board.

Laundry:
Install 3 x 600 braces for shelving support;
Relocate storage unit (ready to be rolled into place);
Erect wall 600 x 2410 once unit is in place ready for door + frame.

Kitchen/dining/lounge:
Frame wall for a perfect edge on jib for flush TV 1230 x 730;
Remove rangehood duct and install flexi duct in same location;
Build frame over existing fireplace to support stone 1565 x 2350;
Numerous gib patching for electrical + flush sprinkers etc.

Outside Deck:
Frame and lay decking 7800 x 2100;
Frame planter box from sleepers;
Erect storage box from decking.

Back of house + other:
Approx 8m of skirting repair;
Finish ceiling to allow an 2000 x 20 LED aluminum extrusion with perfect edge on gib;
Erect frame for wardrobe sliding doors;
Dynabolt 2 floor safes;
Erect small wall 600 x 400 and finish hidden door to fit;
Install two doors in garage lockers.

All demolition work has been completed and cleared. Power disconnect to area of work, electrician on site when needed once wall erected prior to jib. Most construction material is on site or to be delivered shortly. Ideally I would like the construction components above to be completed by 8th November so we can be ready for plasterers..

Tradespeople

Tradie #1 11 jobs Secured job
Tradie #2 4 jobs No longer in contact
Tradie #3 12 jobs No longer in contact
Tradie #4 1 jobs No longer in contact

Review for this job

Workmanship
 5
Cost
 5
Schedule
 5
Communication
 5