Review

Beam to re-attach

Job image
Job image
Job image
Job image

Job description

General Building
Auckland

I have a loose panel of wood that goes from floor to ceiling that serves as a design cover and protective layer between some sharp metal ends to a beam. The wood needs to be re-attached as currently held together with duct tape. Originally held with nails and glue. This is a restaurant and best time to complete the job is between 9-11am.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Really happy with the work completed, an the communication and speed to take on the job.

Work carried out by the owner/operator
Reviewed on 10-10-2018

Tradesperson reply
"Thanks Jenny!"

Verified Builderscrack review

Trade professionals

#1 Tradie 1 No recent reviews 151 jobs Secured job
#2 Tradie 2
155 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo