Replace ceiling tiles with gib, refresh insulation, square stop and paint, remove skirting boards in preparation for replacing flooring.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
A couple of hiccups along the way, which Thomas worked hard to address and the end result is perfect. A really hard working team, thanks.
Work carried out by the owner/operator
Reviewed on 19-08-2018
Partner with Builderscrack
Get work