1. replace summerhill stone blocks around a bathroom window that has been shifted and approximately 2.5 square metres of wall by a door that has been altered. bricks have been saved and cleaned. I can cut cut blocks as need on install day if its a monday to save a bit of time. 2. supply and install approx 3.2 square metres of either, white summerhill stone (to match house) or --- concrete block (to match garrage) to block up the old entry to house which was between the house and garrage. Framework and paper is in place. Mondays are good but any day can work.
Partner with Builderscrack
Get work