Verified work review

Breeze block/plaster wall seperated from adjoining wall

Job image
Job image
Job image
Job image

Job description

Brick Fences & Garden Walls Hokowhitu, Palmerston North

Published on 14th April 2026

A breeze block wall with plaster finish has separated away from a adjoining breeze block plaster finished wall leaving a 2-3cm gap. This has been caused by weight of wooden gate hinged to the first wall over 22 years. Gate is now difficult to open/close. The wall that was moved is approx 2 foot of breeze block with plaster finish attached to a brick pillar which wooden gate attached. Looking to have the wall that has moved put back in place and secured to adjoining wall not to move again


Verified work review

Quality of work
5.0
The quality of workmanship provided
Cost
5.0
How well they kept to the quoted cost
Schedule
5.0
How well they kept to schedule
Communications
5.0
Their professionalism and responsiveness

"Very pleased with all steps of process from quote to work completion. Would be happy to use again"

Work carried out by an employee of the company

Review posted by Michael on 26th May 2026


Tradesperson reply

"Thanks so much for the fantastic feedback, Michael. We’re really pleased you were happy with the whole process from the initial quote right through to completion of the exterior wall and fence repairs. Clear communication, reliable scheduling, and quality workmanship are all things we pride ourselves on, so it’s great to hear that reflected in your experience. We appreciate your support and would be more than happy to help again anytime in the future."
26th May 2026

Verified work review

Get connected now with NZ’s largest trade professional network

Get started