Review

Brick on the gate pole

Job image

Job description

Bricklaying
Manukau

I am revising the exiting brick gate pole & need a new one done with concrete in the centre of the pole & bricks around it.my builder is happy to lay the slab.


Review

Workmanship
3.0
Cost
4.0
Schedule
5.0
Communications
5.0

Gate measurement was given but when pier installed ,measurement was out. It appears pier was not filled properly with concrete. When the gate repairer drilled to plug the gate hinges there was no concerete inside. Driveway cobble stones were not cleaned properly with concrete stain on driveway . Bit disappointed.

Work carried out by the owner/operator
Reviewed on 05-06-2021

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo