Hi, We have a small block wall pond to build, only a small job 90 of the --- bricks to be laid. It will be two blocks high, foundations will be done only need the blockwork.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Ross provided exactly what I wanted on time and within budget, highly recommend.
Work carried out by the owner/operator
Reviewed on 05-07-2018
Partner with Builderscrack
Get work