Job description

Blockwork
Christchurch

Retaining wall 25 series around 1000 blocks. some are 20 series. Work is on hill side split level. Three stages, Stage 1 Main lower level Stage 2 Upper level Stage 3 Garage Estimated start time stage 1 15th September or could be later to suit. Concrete foundation and Slab is being poured on Monday the 13th September 2021


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Neat and tidy. Hill side job, wasn't the easiest to get to. Well done

Work carried out by the owner/operator
Reviewed on 18-11-2021