Published on 8th September 2021
Retaining wall 25 series around 1000 blocks. some are 20 series.
Work is on hill side split level. Three stages,
Stage 1 Main lower level
Stage 2 Upper level
Stage 3 Garage
Estimated start time stage 1 15th September or could be later to suit.
Concrete foundation and Slab is being poured on Monday the 13th September 2021
| Quality of work |
5.0
|
The quality of workmanship provided |
| Cost |
5.0
|
How well they kept to the quoted cost |
| Schedule |
5.0
|
How well they kept to schedule |
| Communications |
5.0
|
Their professionalism and responsiveness |
"Neat and tidy.
Hill side job, wasn't the easiest to get to. Well done"
Work carried out by the owner/operator
Review posted by Thomas on 18th November 2021
Verified work review