Remove and relay loose sill bricks 0.60 l/m on north wall Grind out and repoint mortar 3.00 l/m on south wall Grind out and repoint mortal 1.5 l/m on west wall ASAP after 3 June. Thanks to people who have been in touch. First opportunity to view on site will be the afternoon of Monday 3 June. Let me know if this is an option for you and what times would suit and I will get back to you to confirm. Email is the best method of contact.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
All good, including a final visit to complete a part that was overlooked the first time.
Work carried out by the owner/operator
Reviewed on 22-07-2019