1) The mortar is failing in several places in the top layer (capping level) of the brick driveway border & steps border - we would like that layer removed and replaced with “new” recycled bricks. Approx. 25 metres total length. See attached photos x3. 2) Trip hazard from raised pavers in one area of paved pathway needs repair. See attached photo x1.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great job, final cost as originally quoted, and completed earlier than expected.
Work carried out by the owner/operator
Reviewed on 11-05-2022
Partner with Builderscrack
Get work