I need a brick fireplace surround removed. The stove is being removed 31/07 and the bricks need to be removed back to the level of the surrounding wall so that plasterboard can go over the opening. This needs to be done between 01/08 and 04/08 to fit in with other trades.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Ethan wasn't required to complete the work in the end but he was very professional accepting my last minute cancellation and was very flexible with fitting in with the tight schedule I had specified. Good communication, just not needed in the end!
Reviewed on 15-08-2018
Partner with Builderscrack
Get work