Remove and dispose of 6.5 sq metres of 9 mm fibre cement sheet decking plus 6.7 square metres of 6 mm sheet fixed vertically from deck to ground. his is all at ground floor level. In addition there are two small pieces (0.3 sq m total) of cladding alongside a clerestory window, ground floor roof. There is drive on access to the site, the decking material is at the back of the flat but there is good flat access. The roof is concrete tiles, approx 25degree pitch, can be walked on.
Partner with Builderscrack
Get work