I have one room that has asbestos ceilings that need removed. There are other works that are being held up while there is asbestos around. Ideally trades people would start as soon as possible.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Excellent all round. Thanks James.
Work carried out by the owner/operator
Reviewed on 16-07-2016
Partner with Builderscrack
Get work