65m2 of Asbestos (stipple plaster) to be removed from ceilings as class B. One room has to decontaminated from asbestos dust/fibres as poor containment and documenting from previous homeowner has resulted in this room having works done within, disturbing the stipple, which I believe has to be done by a class A certified removalist? 55m2 of the ceiling needing removed currently has Gib over the top of the original plasterboard & stipple. All ceilings are 2.4m from floor. Extra allowances for independant air tests/swabs would be appreciated as I've been under quoted for this in the past which has put a fair dent in the savings. Estimates at this stage would be satisfactory as we're currently not living at the property. Thanks