Verified work review

Building consent amendment for 2 bed dwelling

Job image

Job description

Draughting Services Ostend, Waiheke Island

Published on 26th June 2026

I am looking for a draftsman to alter an existing approved building consent. The current plans are hand-drawn and in a PDF. The current plans show two block walls with concrete foundations supporting the dwelling, which is located on a slope. I want a block basement with the same footprint as the dwelling, which will require a larger block wall and alterations to the subfloor due to the increased joist span. With affordability in mind, this space would be a non-habitual basement with storage only and external access. If steel is necessary to span the distance, I would consider additional poles to support the subfloor, but only if the cost were significantly more. However, I would prefer an open space. The basement would have a concrete floor, three sides would be blocks whereas the west facing (front) of the house could be timber. I have attached a basic sketch to show the changes and can provide the approved BC to the final contractor. I have an engineer who will sign off new drawings. Please contact me with a price for the alternations and consultation fees for the application to Auckland council.


Verified work review

Quality of work
5.0
The quality of workmanship provided
Cost
5.0
How well they kept to the quoted cost
Schedule
5.0
How well they kept to schedule
Communications
5.0
Their professionalism and responsiveness

"Shahram was excellent in helping me deal with council for a extensive subfloor and basement building consent amendment. He was a great communicator and completed the work quickly at an affordable price. Highly recommend."

Work carried out by the owner/operator

Review posted by Mathew on 14th August 2026

Verified work review

Get connected now with NZ’s largest trade professional network

Get started