Published on 16th May 2025
I am wanting to put a shower in under my stairs which requires wall to be pushed out and council have advised I need architectural drawings, the photo attached is drawn by the plumber but talks to what we are looking to do
| Workmanship |
5.0
|
| Cost |
5.0
|
| Schedule |
5.0
|
| Communications |
5.0
|
"It’s been super easy working with Stuart, he has completed the drawings to a high standard"
Work carried out by the owner/operator
Review posted by Nicole on 19th June 2025
"Many thanks for your comments ."
Verified Builderscrack review
Partner with Builderscrack
Get work