Published on 16th April 2026
I need two small stumps removed, ideally before Monday 20 April to allow work on a driveway to begin. The larger stump is about 40 cm at the widest point. The area is a building site so there are some obstacles (skip, building materials) that could make it difficult to get large equipment in.
| Quality of work |
5.0
|
The quality of workmanship provided |
| Cost |
5.0
|
How well they kept to the quoted cost |
| Schedule |
5.0
|
How well they kept to schedule |
| Communications |
5.0
|
Their professionalism and responsiveness |
""
Work carried out by the owner/operator
Review posted by Nick on 18th April 2026
Verified work review
Partner with Builderscrack
Get work