Small bathroom (floor 2.1 x 1.6m) needs plastering, noting that excludes behind and above the door and the shower area (can’t put plaster/paint behind where the shower liner goes). [pictures 1 -4] The old hot water cupboard also needs plastering to repair behind where the cylinder was. [picture 5] Then just want to have a do over of some areas where some poor DIY plastering was previously done: - three spots on the ceiling where hanging lights used to be. [pictures 6 - 8] - former switch box for heated towel rail. [picture 9] - area above vanity/around electric switch in another bathroom. [picture 10] Would be ideal if this work could be done on Wed 1 and Fri 3 May.
Partner with Builderscrack
Get work