Foundation piles required for a residential house extension. 41 piles to be excavated. 37 piles to be placed and concreted. 3 strip footing 3m long. The supplier must be LBP and supply a written Producer Statement.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
40 piles, water tank complication, messy brown field residential site and a whole lot of rain halfway through the work. Integrity Piling performed as per there name and completed the difficult job to my satisfaction. Thank you Stephen and Sara. I hope to work with you again.
Work carried out by the owner/operator
Reviewed on 25-02-2016
Tradesperson reply
"Our pleasure. Thank you Dan and Simone for the opportunity!!
Integrity Foundations - Repiling Relevelling Auckland"
Partner with Builderscrack
Get work