1. I require 2 new power points (RCD?) to be installed in a bathroom and a toilet to allow connection to electric bidets. Both walls are external - I am happy to repair/paint the walls after cable installation. 2. I need a wall mounted heater to be removed from a hallway as per pic.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Dave and Gavin did a great job - they came up with innovative solutions to complete a professional looking outcome. Arrived when they said they would and completed the jobs on time and on budget. I recommend these guys!
Work carried out by the owner/operator
Reviewed on 11-05-2024
Partner with Builderscrack
Get work