Review

Remove/hang doors and replace some handles

Job description

General Doors
Dunedin

Published: 2 July 2020

We have 3 internal doors and 2 sets of wardrobe doors that need to be taken off the day before we have carpet laid. Because the carpet has a thick pile and the underlay is also thick, the doors will most probably need to be shaved off at the bottom before putting back up (the day after the carpet is laid). Also, we have 4 door handles that need replaced. We would supply the door handles and have them here, ready to be put on the doors. Rather than a quote we are happy to accept an hourly rate for the job and callout fee (if that applies). The carpet is on order, and it could be between 3-6 weeks (or longer) before they are able to lay it. It is most important that whoever accepts this job understands they need to be able to come the day before the carpet is laid and the day after the job is complete (even though at this stage I can't give a date).


Review

Workmanship
4.0
Cost
2.0
Schedule
3.0
Communications
2.0

We were happy with the work that was complepted. The most important part of the job was done - triming doors and rehanging after new carpet had been put down. However, communications proved tricky and parts of the job agreed upon were not done ie taking the doors off the day before and installing a handle and lock on an outside door.

Work carried out by the owner/operator
Reviewed on 13-10-2020

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo