Locate and mark-out and protect existing services-power, sewerage and stormwater connections to section off end of cul-de-sac and do new consent for kerbing for a new driveway to meet up with the existing driveway already on the section , remove spoil and surface same as existing driveway. Put in new water supply to the section inside the boundary of the section to connect to existing water piping . Need done and completed in March please . No access to do in Feb .
#1 | Tradie 1 |
|
5 jobs | No longer in contact |
#2 | Tradie 2 |
|
5 jobs | No longer in contact |
Partner with Builderscrack
Get work