Approx. 80sqm concrete to designated areas – ensure all fall is directed into sump or strip drain Stand 3x 1.6mtr tantalise posts ( --- ) with concrete nib to boundary 56/58 Box curve around garden area as indicated Box 4 steps and landing from existing steps to drive level Supply and place 3mtr strip drain with support concrete to the outside edge - connect into existing discharge system Supply/install starters into the end of the existing drive concrete Place 20mpa concrete with ultra 500 fibre mesh Cut all dummy joints Power float Broom steep parts of driveway to allow better traction
#1 | Tradie 1 | No recent reviews | 3 jobs | No longer in contact |
Partner with Builderscrack
Get work