We are wanting a low level deck, measuring approximately 4.5m by 10.7m. It does not require railings or stairs. The paving stones in the photo will need to be lifted. We are also wanting another tradie to do some stone work around the poles that come down from the upper deck. The stone work will need to be done before the deck is built.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Brilliant job, we are very happy with the workmanship and the finished deck.
Work carried out by the owner/operator
Reviewed on 29-12-2014
Partner with Builderscrack
Get work