Kitchen floor requires replacement following hidden and gradual water damage from a tap leak. ALL KITCHEN CABINETRY, APPLIANCES ETC WILL BE REMOVED BY OTHERS PRIOR TO WORK COMMENCING AND WILL BE REINSTATED ONCE NEW FLOOR IS INSTALLED. 1. Kitchen cabinets to be removed (by others) 2. Remove damaged floor vinyl 3. Remove underfloor insulation in the area and keep to one side 4. Cut out rotten kitchen floor 5. Ensure all joists, etc in satisfactory condition. If there is any rot in these they will need to be replaced too. 6. Install new kitchen floor 7. Reinstate under floor insulation 8. Kitchen cabinetry and appliances to be reinstated (by others) 9. Floor to be prepared for vinyl installation 10. Install vinyl
#1 | Tradie 1 | No recent reviews | 58 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 1 job | No longer in contact |
#3 | Tradie 3 |
|
304 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 17 jobs | No longer in contact |
#5 | Tradie 5 |
|
16 jobs | No longer in contact |
#6 | Tradie 6 | No recent reviews | 20 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 12 jobs | No longer in contact |
Partner with Builderscrack
Get work