We have a rotten timber shower door frame that needs to be replaced. Only the bottom of the frame needs to be replaced I think as shown in the photos. The quote should also include painting of the new timber.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Excellent. Very impressed with Ricky.
Work carried out by the owner/operator
Reviewed on 22-05-2024
Tradesperson reply
"Thank you"
Partner with Builderscrack
Get work