I have 4 areas of walls that need replacing with gib. Each need to be gib stopped and then painted. Each description in order of pictures. 1. In the shower room has two areas need replacing. Wet ceiling area needs to be identified. Picture of the ceiling bubbled and paint flaking off. Wet ceiling wall removed and then replaced with new GIB. GiB stopped, and then painted. 2. In the bathroom, the second area is a side wall where are leak was repaired. Wet GIB has been removed. New GIB installed, GIB stopped and then paint. 3. The toilet is next to the bathroom. The leak was repaired. The wall is wet near the checkered lino floor and part of the skirt board. The wall and floor needs to be moisture tested. The wet area of the wall needs to be removed and the skirting board. New GIB installed, stopped and painted. New skirting board installed and painted. 4. The hall cleaner supply cupboard had wet GIB removed. It needs new GIB, GIB stopping and paint. 5. The hall linen cupboard needs back wall tested for moisture and then remove all wet GIB. New GIB installed, stopped and painted. 6. All paint colour is the same {quarter spanish white].
#1 | Tradie 1 |
|
2 jobs | No longer in contact |
#2 | Tradie 2 |
|
51 jobs | No longer in contact |
#3 | Tradie 3 |
|
45 jobs | No longer in contact |
#4 | Tradie 4 |
|
12 jobs | No longer in contact |
#5 | Tradie 5 |
|
130 jobs | No longer in contact |
#6 | Tradie 6 |
|
65 jobs | No longer in contact |
#7 | Tradie 7 |
|
15 jobs | No longer in contact |
#8 | Tradie 8 |
|
60 jobs | No longer in contact |
Partner with Builderscrack
Get work