Retaining wall 25 series around 1000 blocks. some are 20 series. Work is on hill side split level. Three stages, Stage 1 Main lower level Stage 2 Upper level Stage 3 Garage Estimated start time stage 1 15th September or could be later to suit. Concrete foundation and Slab is being poured on Monday the 13th September 2021
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Neat and tidy. Hill side job, wasn't the easiest to get to. Well done
Work carried out by the owner/operator
Reviewed on 18-11-2021
Partner with Builderscrack
Get work