Gib fixing - Gib stopping
(job #8028)
This job is now closed to tradesmen not already talking with the homeowner.
Job details
| Trades | Plasterers |
| Where | Auckland - Waitakere City - Glendene |
| Posted | 19 months ago |
| Description | We have finished first stage of reno. Now have a new bathroom 3*3m2 and a new dressing [www] 2.1m regibed. We need plaster the new wall and repair some anjoint walls. There are also some plaster work at our stage two after we installed the bathroom. There will be another bathroom, new hall way stair way 3 walls. |
