Plumbing & Gas in New Kitchen

(job #6761)

This job is now closed to tradesmen not already talking with the homeowner.

Job details

TradesPlumbers, Gas Fitters & Installers
WhereAuckland - Auckland City - Royal Oak
Posted21 months ago
DescriptionNew kitchen to be installed in approximately 5 weeks. Require:

Phase One
All services disconnected in 2.5 weeks to enable removal of old kitchen. Disconnect taps and dishwasher.

Phase Two
Install of new kitchen in approx 5 weeks. Move dishwasher position (only by about 600-mm), establish connection and install waste disposal, install new mixer tap.

Gas Hob
Currently considering a gas hob however will need to be run off a bottle. Would like a guide to cost of installing a gas line 2 m under a wooden floor to carport where bottle can be kept. Also the cost of installing and connecting the hob.
Plumbing & Gas in New Kitchen

Tradelist

Tradesman #1Tradesmen are reviewed and rated with hammersBuilderscrack Pro2 jobs

Similar jobs

Removal of Leaking Wa... (#6769)  -  Bathroom Renovation /... (#6751)  -  Remove gas heater (#6748)