Published on 31st August 2010
I have a light with 2 switches in my hall. I would like to add a third switch.
There is access in the ceiling and the gib can be cut to run the wall cables.
| Quality of work |
5.0
|
| Cost |
5.0
|
| Schedule |
5.0
|
| Communications |
5.0
|
"I could write a page about how pleased I am with all aspects of the job, but I decided to say that if this efficiency, quality, professionalism and pricing is maintained then Iain and this company are destined for a great, great future."
Work carried out by the owner/operator
Review posted by Wyn on 14th September 2010
"Very nice guy to work for. I would recommend to all other trades."
14th September 2010
Verified work review
Partner with Builderscrack
Get work